Beautiful day so I put up the Christmas lights. |
And covered the yews with deer block. |
Air returns were installed in the basement bedrooms. |
Bathroom exhaust fan ductwork was also installed. |
Tub was to be delivered between 1 and 4, it arrived at 5. |
Getting ready to move the water meter tomorrow. |
No comments:
Post a Comment